A large-scale residential complex with its own luxurious infrastructure is located in the Tomyuk district (Erdemli, Mersin), consists of three blocks of 15 floors. Distance to the sea – 150 m. Near the complex are chain stores, pharmacies, ATMs, educational and medical institutions.
The complex project includes the following apartment layouts:
In this complex, linear 2 + 1 apartments (two bedrooms and an American-style kitchen-living room) are available for purchase. From the apartment there is access to a large private terrace.
All apartments are fully finished: built-in kitchen, worktop, sink, fully equipped bathrooms, windows and balcony doors with double glazing, steel front door, laminate and tile on the floor, interior doors, wardrobes in hallway and bathroom, satellite TV system, etc.
When buying, there is an interest-free installment plan until the end of construction. The project is of interest for investing and increasing one’s capital, since at the design and construction stage the prices for apartments in the complex are lower than the market prices for finished objects.
Tomyuk(tur. Tömük) is a cozy neighborhood in the Erdemli region, which is part of the province of Mersin. Mersin is 27 km away and Erdemli is 12 km away, the center of which can be reached in 10 minutes by public transport. To the city of Mersin, a bus and minibuses constantly run, the journey time is 30 minutes.
Tomyuk is a piece of paradise, for those who prefer tranquility to the bustle of the city, wide embankments for walking and playing sports, and chain stores within walking distance. New quarters are being built here on the seashore, not far from the D-400 highway connecting Mersin with the west.
A huge advantage of this area is the proximity to the city center, as well as the presence of beaches with the “Blue Flag” and fine sand. The famous Maiden’s Castle (Kız Kalesi) is also located here, which makes a great contribution to the tourism sector and is the most suitable place for swimming, because This beach is marked with the Blue Flag.
Construction period: December 2022 – December 2024.
For more information fill out the form and our manager will contact you shortly
To order an online viewing, fill out the form and our manager will contact you shortly