The residential complex with its own extensive infrastructure is located in the Tomyuk area (7 km to Erdemli, 27 km to Mersin) and consists of two blocks of 13 floors. Distance to the sea – 450 m.
The complex project includes the following apartment layouts:
In this complex, linear 2 + 1 apartments (two bedrooms and an American-style kitchen-living room) are available for purchase. The project of this particular layout provides for a common space of the kitchen and living room with clearer zoning for comfortable cooking and relaxation.
All apartments are fully finished: built-in kitchen, worktop, sink, fully equipped bathrooms, windows and balcony doors with double glazing, steel front door, laminate and tile on the floor, interior doors, wardrobes in hallway and bathroom, air conditioning in every room, satellite TV system, etc.
When buying, there is an interest-free installment plan until the end of construction. The project is of interest for investing and increasing one’s capital, since at the design and construction stage the prices for apartments in the complex are lower than the market prices for finished objects.
Tomyuk(tur. Tömük) is a cozy neighborhood in the Erdemli region, which is part of the province of Mersin. Mersin is 27 km away and Erdemli is 12 km away, the center of which can be reached in 10 minutes by public transport. To the city of Mersin, a bus and minibuses constantly run, the journey time is 30 minutes.
Tomyuk is a piece of paradise, for those who prefer tranquility to the bustle of the city, wide embankments for walking and playing sports, and chain stores within walking distance. New quarters are being built here on the seafront right on the main D-400 highway connecting Mersin with the west.
A huge advantage of this area is the proximity to the city center, as well as the presence of beaches with the “Blue Flag” and fine sand. The famous Maiden’s Castle (Kız Kalesi) is also located here, which makes a great contribution to the tourism sector and is the most suitable place for swimming, because This beach is marked with the Blue Flag.
Construction period: June 2022 – May 2024.
For more information fill out the form and our manager will contact you shortly
To order an online viewing, fill out the form and our manager will contact you shortly